Rutland Railway
13Jan/13Off

Progress!

Started installing sections today.

2013-1-13 004

First the section over the freezer.

2013-1-13 006

Then this section attached to the freezer section. Legs are next and then the swing gate to connect the layout to the existing portion of the layout.

layout-2013

This is the layout plan for this area. Only the section to the left needs to be attached, which I will get to later this week.

After playing with arrangements for my yard throat, I think I am going to have to go with curved turnouts for that area. Joy! I had hoped to re-use some of the turnouts I had saved from before.

Filed under: Layout Comments Off
Comments (0) Trackbacks (0)

Sorry, the comment form is closed at this time.

Trackbacks are disabled.